Upgraded for next-generation wind turbine installation
Cadeler A/S is a major player in the offshore wind installation market, focusing on wind turbine installation. With the increasing size of the next generation wind turbines, vessels with larger crane capacities and hook heights are needed.
In response to these evolving market demands, the decision was made to replace the main crane on the Wind Orca.
Vuyk was selected for Wind Orca engineering
To carry out this major upgrade, Vuyk Engineering was selected to perform the design and engineering work entirely in-house. The scope of work included both naval architectural and structural engineering modifications required for the replacement of the leg-encircling main crane on the Wind Orca.
A key objective of the engineering package was to optimize and minimize the structural reinforcements and vessel modifications needed. This approach ensured that the impact on the existing structure of the Wind Orca remained as limited as possible.
Design Scope Wind Orca upgrade
- Structural modifications of the crane pedestal and vessel hull for the crane upgrade
- Strength validation of leg and jacking system
- Design of new boom rests and hook baskets
With this upgrade, the Wind Orca was prepared to meet the demands of future offshore wind projects, enabling the installation of larger turbines in deeper waters. The collaboration between Cadeler and Vuyk Engineering Rotterdam ensured that the Wind Orca remained a powerful and future-ready asset in the offshore wind sector.
Photo credit: Cadeler A/S
22 Responses